Dorchester County Government Contracts, RFPs & Bids

Browse government projects, RFPs, and bids from 9 agencies in Dorchester County, South Carolina.

SCUpdated weekly
7Projects
9Agencies
3Sectors

Dorchester County is planning your next contract right now.

We read every board minute and budget in Dorchester County. You get the projects — with decision-maker contacts — before the RFP.

Get started free

Trusted by teams at

Motive logo
Veritone logo
TerraCycle logo
Cyvl logo
WithersRavenel logo
Derivita logo
Comcate logo
SafeTouch logo
IANS Research logo
Motive logo
Veritone logo
TerraCycle logo
Cyvl logo
WithersRavenel logo
Derivita logo
Comcate logo
SafeTouch logo
IANS Research logo
Motive logo
Veritone logo
TerraCycle logo
Cyvl logo
WithersRavenel logo
Derivita logo
Comcate logo
SafeTouch logo
IANS Research logo
Motive logo
Veritone logo
TerraCycle logo
Cyvl logo
WithersRavenel logo
Derivita logo
Comcate logo
SafeTouch logo
IANS Research logo

Recent Projects

Government Projects in Dorchester County

7 projects across 1 agencies — sorted by relevance and recency.

The PUD references a preliminary traffic impact assessment by HDR and notes that Varn will be responsible for site-specific improvements and will cooperate with the Town, Dorchester County, and SCDOT on off-site improvements. Specific roadway, intersection, or signal projects are not detailed in the text. This suggests upcoming design and construction work for traffic calming, collector roads, turn lanes, and possibly intersection upgrades linked to the development phases.

Pre-RFP
$0Dec 1, 2022

The Varn PUD includes a commercial node along Carter Road near downtown Ridgeville, with up to 120,000 SF of neighborhood commercial, hospitality, retail, service, and restaurant uses. No specific site plans or tenants are set in the rezoning text, only high-level land use and design standards. This signals future demand for commercial site planning, building design, tenant fit-outs, parking, lighting, and shared parking solutions as the area builds out.

Pre-RFP
$0Dec 1, 2022

Within Appleby, up to 120,000 SF of neighborhood commercial is planned at Campbell Thicket and Givhans Roads, allowing restaurants, retail, civic uses, breweries, and community recreation. No commercial developers or tenants are named yet; Town staff must still approve detailed commercial design guidelines before permitting. This will drive future needs for commercial site design, tenant build-outs, signage, lighting, IT, and operations support as spaces are leased and built.

Pre-RFP
$0Dec 1, 2022

The Appleby PUD rezoning application outlines a 10-year mixed-use development in Ridgeville with up to 1,200 single-family homes, 120,000 SF of neighborhood commercial, and a 5-acre town park on 489 acres. Initial construction was projected to begin in 2023 and run through about 2033, with phased plats requiring Town Planning Commission and staff approvals. This is early-stage entitlement and infrastructure planning, creating needs for civil engineering, traffic, utilities, stormwater, park design, and vertical development services over the coming decade.

Pre-RFP
$0Dec 1, 2022

The Varn PUD rezoning sets up a 10-year, 632-acre mixed-use development near Ridgeville, with up to 1,400 homes, 120,000 SF of commercial, a 3-acre civic site, and a 6.8-acre town park. Initial construction was projected to begin in 2023 and continue through about 2033, with phased plats and infrastructure needing approval by the Town. This creates long-running demand for site work, vertical construction, utilities, stormwater, traffic improvements, and community amenities across multiple bid packages and subcontracts.

Pre-RFP
$0Dec 1, 2022

The plan commits to at least 20% open space and a 5-acre town park along Campbell Thicket Road, to be donated to and maintained by the Town after acceptance. Specific park amenities are not detailed yet, beyond general community recreation uses like trails, fields, playgrounds, and gardens. This indicates future municipal scopes for park master planning, design, construction, playground and sports equipment, and ongoing maintenance services once the Town accepts the park.

Pre-RFP
$0Dec 1, 2022

The PUD dedicates a 6.8-acre Town Park along the northern boundary of the site to be deeded to the Town of Ridgeville as part of the open space network. The rezoning text defines it only broadly as community recreation and open space, with no detailed program, design, or construction plan. This creates a pending need for park master planning, public engagement, design, and eventual construction and maintenance planning once the Town accepts the land.

Pre-RFP
$0Dec 1, 2022

Explore Dorchester County's government projects — free.

Self-serve. No call required. Live data in minutes.

Try Civic IQ for free →

Frequently Asked Questions

Procurement FAQs for Dorchester County, South Carolina

Bring us your territory.
We'll show you what is forming.

B2G and SLED sales intelligence. Surface government procurement signals from 100,000+ state, local, and education agencies months before the RFP.

Try Civic IQ for free