Salt Lake County Government Contracts, RFPs & Bids

Browse government projects, RFPs, and bids from 25 agencies in Salt Lake County, Utah.

UTUpdated weekly
15Projects
25Agencies
9Sectors

Salt Lake County is planning your next contract right now.

We read every board minute and budget in Salt Lake County. You get the projects — with decision-maker contacts — before the RFP.

Get started free

Trusted by teams at

Motive logo
Veritone logo
TerraCycle logo
Cyvl logo
WithersRavenel logo
Derivita logo
Comcate logo
SafeTouch logo
IANS Research logo
Motive logo
Veritone logo
TerraCycle logo
Cyvl logo
WithersRavenel logo
Derivita logo
Comcate logo
SafeTouch logo
IANS Research logo
Motive logo
Veritone logo
TerraCycle logo
Cyvl logo
WithersRavenel logo
Derivita logo
Comcate logo
SafeTouch logo
IANS Research logo
Motive logo
Veritone logo
TerraCycle logo
Cyvl logo
WithersRavenel logo
Derivita logo
Comcate logo
SafeTouch logo
IANS Research logo

Recent Projects

Government Projects in Salt Lake County

15 projects across 4 agencies — sorted by relevance and recency.

The Utah Board of Water Resources is committing $7,604,000 from the Conservation and Development Fund to Lake Creek Irrigation Company for a project east of Heber City to replace and upsize about 15,000 feet of pipeline, replace a diversion structure, replace a pressure reducing valve and vault, install a system water meter and vault, and add new connections to the distribution system. Bids were opened in May 2026 and came in below the engineer’s estimate, setting the updated total project cost at $8,946,000, with the company contributing $1,342,000 and repaying the Board at 1.24% interest over about 26 years. With a contractor selection effectively complete following the May 2026 bid opening, the main construction award is decided, but the scale and scope signal follow-on needs in construction management, controls, metering, and long-term O&M. Vendors can target Lake Creek Irrigation Company and its engineer, Bowen Collins & Associates, for ancillary services such as instrumentation and SCADA integration, leak detection, asset management tools, and support for future expansion or optimization of the upgraded system.

Contract Award
$8,946,000Jun 25, 2026

North Creek Irrigation Company of Mt. Pleasant is moving forward with a $6,020,000 project to pressurize its entire system by piping about seven miles of unlined open ditch, installing turnout meters, and improving the headworks structure northeast of Mt. Pleasant City. The Utah Board of Water Resources is reducing its financial role and committing $500,000 (8.3% of total cost) from the Revolving Construction Fund at 0% interest over 15 years, after the sponsor secured significant WaterSMART and Utah Department of Agriculture & Food grants, and has final bid tabulation for Phase I plus engineer’s estimates for Phase II. With funding realigned and federal and state grants in place, the project is fully financed and in execution, but two-phase construction and metering installation indicate ongoing needs. Vendors can engage the company and its engineer, J‑U‑B Engineering, around construction support, meter technology, telemetry, and potential future optimization or expansion beyond the current phases.

Contract Award
$6,020,000Jun 25, 2026

Highland City is nearing completion of a project to purchase and install about 4,500 secondary meters, originally estimated at $9,800,000 with a $5,000,000 ARPA grant from the Board and a $2,000,000 WaterSMART grant. As actual costs have decreased to $9,150,000, the applicant is asking the Utah Board of Water Resources to amend the grant contract so that the Board still provides 70% of the non‑grant project costs, up to the statutory cap of $5,000,000, effectively adjusting the percentage share but not the dollar cap of grant funds used. The Board’s decision is about contract terms rather than new procurement, but the city now has a large advanced metering infrastructure installed or nearly installed across its secondary system. Vendors can use this as a signal that Highland may need ongoing AMI software, data analytics, customer engagement tools, and maintenance support, and that its staff and engineer (BT Engineering) may be considering additional phases or leveraging the metering data for conservation and system optimization.

Contract Admin
$9,150,000Jun 25, 2026

Twin Creeks Special Service District is expanding its Jones Dam safety upgrade project east of Heber City after excessive seepage was discovered at the downstream toe during initial reservoir filling in July 2025. The Utah Board of Water Resources is recommending an additional $1,476,000 in dam safety grant funds, raising its contribution to $3,668,000 (80% of the now $4,585,000 total project cost), to support Phase 2 work extending the toe drain along both abutments and adding a pipeline to move seepage to a nearby reservoir in the district’s system. The original Phase 1 work improved the spillway, added a stability berm, installed drains, and lined the outlet conduit, but field performance drove this new phase and contract amendment. With Bowen Collins & Associates as engineer and a multi-phase construction program, vendors can look at geotechnical, instrumentation, seepage monitoring, construction services, and long-term dam safety monitoring tools as follow-ons to the grant-funded civil work and support the district in ongoing risk management.

Contract Admin
$4,585,000Jun 25, 2026

Cache Highline Water Association has secured a funding commitment of $255,000 from the Revolving Construction Fund for a $795,000 project in Smithfield City to install a fold-and-form liner in an existing 36-inch metal pipeline, along with new concrete anchors, a traveling screen, sluice gates, a box culvert, sediment basin, and baffled chutes. The project is also backed by a WaterSMART grant and a Utah Department of Agriculture and Food Water Optimization Grant, with construction already underway and scheduled to be completed in summer 2026. The Board’s 0% loan over 25 years finalizes the funding plan, and the mention of a SCADA system in the project summary suggests technology and integration components beyond civil works. Vendors can approach the Association and engineer Sunrise Engineering for SCADA design and integration, instrumentation, maintenance services, and post‑construction optimization of screening, sediment management, and control systems once the physical upgrades are installed.

Contract Award
$795,000Jun 25, 2026

Wolf Creek Irrigation Company is pursuing a $300,000 project to replace approximately 350 feet of deteriorated main service pipeline running under State Route 158 near Eden, to avoid loss of water delivery and potential damage to the highway. The Utah Board of Water Resources is being asked to both authorize and commit 85% of the project cost ($255,000) from the Revolving Construction Fund at 0% interest over 15 years, with construction scheduled to begin soon after funding is acquired and to be completed in less than one month. Engineering services are being provided by Gardner Engineering, and the board has previously funded two other projects for this system, including a recently completed secondary metering project. With a short, urgent construction window and work under a state highway requiring traffic control and permits, vendors offering construction, trenchless technologies, traffic control, and rapid procurement of pipe and appurtenances can still participate as the project moves from funding authorization to contractor selection and field work.

Active Opportunity
$300,000Jun 25, 2026

The District awarded a PFAS mitigation construction project to Forge Industrial for about $190,000, below the $250,000 engineer estimate. State grant compliance is in progress and field work is starting with potholing on 100 East, followed by excavation. This confirms Forge as the incumbent for this scope; firms should look at follow-on needs such as monitoring, optimization, media replacement, and future PFAS treatment phases.

Contract Award
$190,000May 13, 2026

White City Water Improvement District approved moving forward with two AMI meter reading repeater towers, based on a propagation study and quote from Neptune, their existing meter supplier. One tower will be installed on the district office building and one on the booster station, with an expected cost of about $40,000 and estimated initial coverage of roughly 40% of the district. The April 15, 2026 minutes show the Board formally approving the AMI Meter Reading Tower contract, and by May 20, 2026 staff reported the two towers had been ordered with delivery in about six weeks. This is a decided implementation but opens the door for follow-on work such as network optimization, additional repeaters, analytics, and integration with billing and customer portals.

Contract Award
$40,000Jun 17, 2026

Council authorized entering into a relationship with EDC Utah for economic development support at $5,000 per year. This formalizes an external partner to assist with business attraction and related activities. While the primary contract is awarded, other consulting, marketing, and site-readiness vendors can coordinate with staff to complement EDC Utah’s work.

Contract Award
$5,000May 26, 2026

Magna amended its interlocal with Salt Lake County Sheriff’s Office to extend the CVIPI Safety Success grant program through September 30, 2026, adding $145,000 in unspent DOJ funds. These dollars support Choose Gang Free and related interventions to reduce youth violence via community, public health, and public safety strategies. Service providers in violence prevention, data/evaluation, and youth engagement can seek subcontracts or partnerships as County and city plan how to deploy the extended funds.

Grant Funding
$145,000Jun 9, 2026

Showing 10 of 15

Explore Salt Lake County's government projects — free.

Self-serve. No call required. Live data in minutes.

Try Civic IQ for free →

Frequently Asked Questions

Procurement FAQs for Salt Lake County, Utah

Bring us your territory.
We'll show you what is forming.

B2G and SLED sales intelligence. Surface government procurement signals from 100,000+ state, local, and education agencies months before the RFP.

Try Civic IQ for free