Travis County Government Contracts, RFPs & Bids

Browse government projects, RFPs, and bids from 29 agencies in Travis County, Texas.

TXUpdated weekly
28Projects
29Agencies
14Sectors

Travis County is planning your next contract right now.

We read every board minute and budget in Travis County. You get the projects — with decision-maker contacts — before the RFP.

Get started free

Trusted by teams at

Motive logo
Veritone logo
TerraCycle logo
Cyvl logo
WithersRavenel logo
Derivita logo
Comcate logo
SafeTouch logo
IANS Research logo
Motive logo
Veritone logo
TerraCycle logo
Cyvl logo
WithersRavenel logo
Derivita logo
Comcate logo
SafeTouch logo
IANS Research logo
Motive logo
Veritone logo
TerraCycle logo
Cyvl logo
WithersRavenel logo
Derivita logo
Comcate logo
SafeTouch logo
IANS Research logo
Motive logo
Veritone logo
TerraCycle logo
Cyvl logo
WithersRavenel logo
Derivita logo
Comcate logo
SafeTouch logo
IANS Research logo

Recent Projects

Government Projects in Travis County

28 projects across 8 agencies — sorted by relevance and recency.

Jonestown’s CIP includes improving existing unimproved streets by paving with asphalt, ribbon curb, culverts, and restoration, with about $2.51 million programmed over FY 2026‑29. Priority streets include Leander Street, Hobby Lane, West Rim, Rock Cliff, and Alvarado Pass, with funding tied largely to a 2026 tax note. Sitework and paving contractors, drainage specialists, and survey/engineering firms can target this program as annual projects are defined and taken to bid.

Pre-RFP
$2,510,000Jul 9, 2026

The Streets CIP sets a multi-year street rehabilitation program aiming to bring all improved streets to a condition rating of 80 or better, with about $1.75 million budgeted across FY 2025‑30 and an annual target around $450,000. Work includes mill-and-overlay and related repairs on segments like Georgetown Drive, West Rim, Reed Park, North Place, and others, guided by a 2023 street assessment and 2026 KPA memo. Paving contractors, materials suppliers, and construction managers can engage as yearly packages are scoped and bid.

Pre-RFP
$1,754,900Jul 9, 2026

Jonestown is reviewing a five‑year FY 2026‑2027 Capital Improvement Program totaling about $9.33 million across general government, parks, streets, and wastewater utilities. Projects include HVAC replacements at City Hall, building and grounds upgrades, security cameras, generators, park master planning, street rehab and paving, reclaimed water tank replacement, wastewater collection improvements, and land-use/utility planning. This is an early planning stage, so engineering, construction, technology, and grant-support vendors can shape scope, phasing, and funding strategies before procurements are formalized.

Pre-RFP
$9,325,384Jul 9, 2026

Baxter & Woodman’s June 25, 2026 update states that the High Service Pump (HSP) Replacement and Water System Improvements (WSI) projects will be bid together as one project. The existing HSPs are being pulled for measurements by July 2, 2026 so that plans and specifications can be ready for permitting by July 31, 2026, with WSI plans to be submitted for permitting the week of July 6, 2026. The combined HSP/WSI project is now expected to bid and be awarded between November 2026 and January 2027, with an estimated Notice to Proceed on February 1, 2027 and 320 calendar days to substantial completion around December 18, 2027. This bundled project will cover replacement of high service pumps and water line/PRV work to address pressure and aging infrastructure, representing a substantial mechanical and pipeline construction opportunity. Vendors providing pumps, electrical/SCADA integration, pipeline construction, and PRV assemblies can still influence specifications and prepare to bid.

Pre-RFP
$5,309,000Jun 30, 2026

Baxter & Woodman reported on June 25, 2026 that the Augusta Standpipe Replacement (elevated storage tank) project plans, specifications, and engineering report were submitted to TCEQ for permitting on June 9, 2026, following an exception request on effluent disposal field separation distance submitted May 27, 2026. The project is budgeted within the November 2025 One-Time Offer allocation and is now expected to be bid and awarded between August and October 2026, with a Notice to Proceed around November 2, 2026 and 420 days to substantial completion in late December 2027. This indicates the district will soon procure a construction contractor for a major elevated storage tank replacement that is on the critical path for the water system. Vendors in tank fabrication, construction, site work, controls, coatings, and related services can still position themselves for the upcoming bid and eventual implementation support.

Pre-RFP
$7,042,000Jun 30, 2026

Travis County WCID No. 19 has developed an updated five‑year Capital Improvement Plan (CIP) and maintenance program totaling approximately 5472161 for FY 2025‑26 through FY 2029‑30, prepared by SI Enviro/Gray‑Civil. The plan bundles a range of capital and recurring maintenance needs including wastewater line televising, subdivision wall replacements, pavement milling and overlay, brick entry reconstruction, and system maintenance such as valve testing, leak detection, fire hydrant work, and irrigation audits. No individual projects or vendors are yet identified in this document; costs are presented as planning-level estimates with a 30 percent contingency, indicating the District is still at the budgeting and scoping stage for future procurements. This represents a pipeline of civil, utility, and infrastructure work that will require design, construction, inspection, and maintenance contractors over the next five fiscal years. Vendors can help the District refine scopes, phasing, and cost estimates, and position themselves for upcoming bid packages as the Board moves from this planning document into formal project authorizations.

Pre-RFP
$5,472,161Jun 9, 2026

The Comptroller’s office is administering the Opioid Abatement fund, with $2.5 million budgeted in FY 2027 for salaries, travel, Salesforce grant management, consulting, accounting, and related systems. While the core administration work and Salesforce deployment are already funded, there is ongoing need for consulting, development, and evaluation support. Firms with Salesforce expertise, grant program evaluation skills, or opioid policy experience can position for follow‑on enhancements, integrations, and analytics to improve management of local opioid grants.

Contract Award
$2,500,000Jul 1, 2026

The city is moving forward with replacing a 122,000‑gallon reclaimed water ground storage tank at the wastewater plant that dates to 2005 and has reached the end of its service life, with a total project budget of about $773,250 funded by a Certificate of Obligation. Design has been underway and construction and inspection are budgeted in FY 2026‑27 and 2027‑28. Tank manufacturers, specialty contractors, and corrosion protection providers can target the upcoming construction phase and potential upgrades to cathodic protection or coatings.

Pre-RFP
$773,250Jul 9, 2026

Trihydro’s June 2026 Bond Program Monthly Status Report shows that the 0.15 MGD WWTP Improvement project is about 95 percent complete in construction, with Associated Construction Partners as the contractor. As of Pay Application 31 dated May 31, 2026, 10.69 million of the 11.2 million contract has been completed, and Trihydro notes that substantial completion is projected for June 20, 2026 with final completion by June 8, 2026 (the schedule table also shows completion into 2028, but the narrative states these earlier dates). Recent work includes completing plant electrical conduits and terminations, energizing the new transformer, installing a new manhole, duct bank and transformer at the POA lift station, vendor testing and training, and SCADA integration work. While the primary construction award is already in place, this major WWTP expansion will create ongoing demand for SCADA integration, optimization, operations support, maintenance services, and potential future add-ons to reclaimed water and drainage projects described elsewhere in the bond program.

Contract Admin
$11,196,925Jun 30, 2026

Trihydro prepared a June 23, 2026 Engineer’s Opinion of Preliminary Construction Costs for a new distribution PRV and associated piping at Venture Drive and Nicklaus Drive. The concept includes replacing an existing check valve, installing a 4-inch ductile iron pressure reducing valve in a precast valve vault with gate valves, pipe supports, and associated water line connections, with a total estimated construction cost of 160,869 including contingency. The work aims to address pressure plane and water quality issues identified at this location and has been coordinated with on-site investigations by Inframark and Baxter & Woodman. The presence of a detailed preliminary cost opinion indicates the district is moving toward scoping and budgeting this small capital project but has not yet issued a bid, giving niche civil contractors and valve suppliers an opportunity to engage early.

Pre-RFP
$160,869Jun 30, 2026

Showing 10 of 28

Explore Travis County's government projects — free.

Self-serve. No call required. Live data in minutes.

Try Civic IQ for free →

Frequently Asked Questions

Procurement FAQs for Travis County, Texas

Bring us your territory.
We'll show you what is forming.

B2G and SLED sales intelligence. Surface government procurement signals from 100,000+ state, local, and education agencies months before the RFP.

Try Civic IQ for free