York County Government Contracts, RFPs & Bids

Browse government projects, RFPs, and bids from 30 agencies in York County, Maine.

MEUpdated weekly
67Projects
30Agencies
21Sectors

York County is planning your next contract right now.

We read every board minute and budget in York County. You get the projects — with decision-maker contacts — before the RFP.

Get started free

Trusted by teams at

Motive logo
Veritone logo
TerraCycle logo
Cyvl logo
WithersRavenel logo
Derivita logo
Comcate logo
SafeTouch logo
IANS Research logo
Motive logo
Veritone logo
TerraCycle logo
Cyvl logo
WithersRavenel logo
Derivita logo
Comcate logo
SafeTouch logo
IANS Research logo
Motive logo
Veritone logo
TerraCycle logo
Cyvl logo
WithersRavenel logo
Derivita logo
Comcate logo
SafeTouch logo
IANS Research logo
Motive logo
Veritone logo
TerraCycle logo
Cyvl logo
WithersRavenel logo
Derivita logo
Comcate logo
SafeTouch logo
IANS Research logo

Recent Projects

Government Projects in York County

67 projects across 16 agencies — sorted by relevance and recency.

Financials show an ongoing meter program with construction in progress totaling about $1.99 million and recent May 2026 purchases of meters and brass from Everett J. Prescott and Core & Main. This indicates a multi-year water meter replacement or AMI/AMR program that is still being executed. Meter, AMI/AMR, software, and installation vendors can look for remaining phases, backflow, analytics, and customer portal components that may not yet be procured.

Pre-RFP
$1,995,596Jun 17, 2026

South Berwick is transitioning from a contracted ambulance model with York Ambulance to an in-house Fire/EMS service and has approved a $2,055,777 emergency services budget for FY 2026-27. Council debate focused on whether to move immediately to 12 full-time EMT/firefighters or phase staffing, and members called for a long-term strategic plan, financial modeling, and exploration of grants and regional partnerships. This indicates continuing planning needs around staffing, equipment, facilities, and funding that may require consulting, grant-writing, and EMS/fire operations support.

Pre-RFP
$2,055,777May 19, 2026

Sanford Council authorized issuing up to $13,450,000 in bonds through the Maine Municipal Bond Bank to fund construction of a new fire station, including engineering, design, and related costs. This is a partial draw from voter-approved funding and formalizes financing so the capital project can move ahead. Contractors, architects, engineers, and specialty public safety vendors should view this as confirmation that money is in place and follow progress for remaining packages, change orders, and the second planned station.

Contract Award
$13,450,000Apr 7, 2026

The 2024 CIP allocates $2.1M for Lower Village Construction, including replacement of about 2,100 feet of sewer main on Western Ave, Beach Ave, and Port Road with new PVC and lateral replacements to the curb. The manager’s report notes that staff are awaiting minor plan revisions from Brown and Caldwell, indicating design is nearly complete. Construction vendors should watch for an upcoming sewer replacement contract in the Lower Village once designs are finalized and bond funds are secured.

Pre-RFP
$2,100,000Sep 5, 2023

The Board reviewed a 2024 Capital Improvement Plan totaling $27.8M, primarily funded by $27.5M in private bonds plus reserve and equity accounts. Projects include a $25M biological upgrade, Lower Village sewer construction, Beach Street siphon replacement, WWTF improvements, and collection system work. Engineering, construction, and equipment vendors should monitor these planned projects, as several large packages still require detailed design, phasing, and formal procurements once funding and plans are finalized.

Pre-RFP
$27,800,000Sep 5, 2023

The district is planning the future of the Doane’s Wharf pump station property and has put design work on hold until an overall property-use plan is resolved. Management recommended creating a developer-funded, non-refundable escrow account to pay for preliminary engineering, legal, survey, and geotechnical work, documented through MOUs. This is early-stage planning where outside engineering, legal, and technical support will be needed once the property plan and escrow structure are finalized.

Pre-RFP
$30,000,000Feb 2, 2021

DEP modeling may force very low nitrogen limits on the district’s discharge, potentially requiring a major treatment plant upgrade. Underwood Engineers was tasked to define the cost of upgrades for both 8 mg/L and 3 mg/L nitrogen limits, with staff estimating a 3 mg/L scenario could reach $30M or more. This is still an evaluation phase, creating a near-term need for planning, funding strategy, and future design and construction services around advanced nutrient removal.

Pre-RFP
$30,000,000Feb 2, 2021

The board discussed a regional collaboration and economic development effort involving COAST transit and a Heritage collaboration group. They referenced a possible $2,000,000 tax anticipation note and contingency funding tied to this regional development work. This points to early-stage planning for multi-town economic or transportation initiatives where consulting, planning, and project management support could be needed as the concept matures.

Pre-RFP
$2,000,000Aug 12, 2008

Sea Vu West Campground is seeking a site plan amendment to add 9 acres, resolve lot coverage issues, add 2.72 acres of coverage, and restore wetland and buffer areas around the main office for its existing 264-site RV park. The Planning Board is workshopping completeness over a 60-day extension, discussing buffer treatments and vegetated pavers, and has waived a public hearing, so technical site design is ongoing. This signals demand for civil and environmental engineering, low-impact development solutions, landscaping, and possibly construction contractors to implement coverage and restoration changes.

Pre-RFP
$0Jul 6, 2026

Drakes Station LLC is advancing a final subdivision and site plan for 46 elderly housing units as part of a Life Care Facility on 9.22 acres at 2030 Post Road, plus a retained two-family dwelling on 1.39 acres. The Planning Board is reviewing an entrance redesign and workshopping compliance with preliminary conditions and completeness, so access, infrastructure, and amenities are still being refined. This senior-housing project will require roadway and utility construction, building construction, specialized life-care amenities, and potentially healthcare, IT, and facility-management systems.

Pre-RFP
$0Jul 6, 2026

Showing 10 of 67

Explore York County's government projects — free.

Self-serve. No call required. Live data in minutes.

Try Civic IQ for free →

Frequently Asked Questions

Procurement FAQs for York County, Maine

Bring us your territory.
We'll show you what is forming.

B2G and SLED sales intelligence. Surface government procurement signals from 100,000+ state, local, and education agencies months before the RFP.

Try Civic IQ for free